Original condition
What the photos start with
The earlier photograph shows green corrosion at an exposed portion of hot-water piping.
What changed
The documented work stage
The work record identifies a localized copper section replacement, and the later photograph shows replacement copper in the open access area.
What remains to be confirmed
Records and finish limits still matter
The record does not establish a complete repipe, final plumbing test, inspection, drying result, ceiling restoration, or long-term performance.
Before you approve similar work
Questions for the written scope
- Which pipe section and connection points does the proposal include?
- What findings would support expanding beyond a localized repair?
- Who evaluates affected materials and confirms any drying requirement?
- Does the price include ceiling closure, texture, primer, and paint?
Work-stage photographs
See the physical sequence.

Earlier exposed corrosion